Quick summary: By the time a construction payment problem starts, you’ve already spent the money. The crew was paid on Friday. The materials are in the building and they aren’t coming back out. Florida gives you real security for that — but it runs on deadlines that don’t forgive, and missing one can end a claim nobody even disputes.
This is what makes construction different from most commercial disputes. In a normal fight over money, both sides still have their money. Here, one side has already converted its cash into somebody else’s building.
None of that changes the law. It does change what “wait and see how it plays out” actually costs you, which is usually more than people think.
Florida gives contractors, subcontractors and suppliers genuine security for payment. It also conditions that security on a sequence of steps taken on time.
Miss one and the security is gone, however good the underlying claim is. A subcontractor owed money for work everyone agrees was performed can lose lien rights entirely by treating a notice requirement as paperwork. That is the single most expensive mistake in this practice area, and it is almost always made by someone who was busy running a job.
The exact periods depend on your role on the project and how the job is set up, which is precisely why the question is worth asking early rather than assuming a number you half remember from a previous job.
Owners and developers, general contractors, subcontractors, suppliers, architects and engineers — on residential and commercial projects across Florida.
Construction sits directly on top of two other things this firm does. A lien claim is a collections problem with a statute attached. A project where the owner or the general contractor has stopped paying and may be insolvent is a creditors’ rights problem. Neither requires a referral here.
That matters because of where these files actually go. Perfecting the lien is the beginning, not the end. If the money still doesn’t come, it gets pursued with the same tools used on any other debt — through judgment and enforcement if that’s what it takes. And if the party upstream files for bankruptcy, the deadlines protecting your claim start running that day, in a practice that also sits in this building.
Kass Shuler has practiced construction, real estate and creditors’ rights in Tampa for over four decades.
The cheapest construction dispute, though, is the one the contract prevented. We would rather look at your form documents once than litigate the same ambiguity on three projects.
The first question is whether your lien rights are still alive — which depends on your role, whether the required notice went out, and when you last supplied labor or materials. That answer determines everything else, so it’s the call to make this week rather than next month.
Both are usually possible, and this is a more common position than people admit. Recording a lien is a statutory step to protect a deadline, not a declaration of war, and it’s frequently understood that way in the industry. The sequence and the tone are choices — what isn’t a choice is letting a deadline pass to keep things comfortable. That costs you the leverage and the relationship, because nothing concentrates a slow payer like knowing the clock has run out on you.
Your lien rights may be, but the underlying debt isn’t. A breach of contract claim survives independently, and where a bond, a personal guarantee or a solvent party is in the picture there may be a route that doesn’t depend on the lien at all. Losing lien rights is a serious blow, not the end of the file.
Retainage is your money and it has its own release conditions, usually tied to completion, punch list and final documentation. Whether those conditions have been met is often the entire dispute. It’s worth checking what the contract actually requires before accepting that it’s simply “not released yet” — and worth checking your deadlines, because retainage claims are subject to the same clocks as everything else.
This is one of the most common owner problems in Florida construction, and whether the payment protects you turns on how the job was documented — releases obtained, affidavits collected, and whether proper notice had reached you. There are also procedures for contesting a lien or transferring it to bond. Do not simply pay twice.
Delay and change order claims live or die on contemporaneous records — the schedule, the correspondence, the daily reports. Getting advice while the project is running is far more valuable than after, because that’s when the record you’ll need is still being created.
Yes, and it’s usually the cheapest work we do for a construction client. Payment timing, change order procedure, indemnity and dispute resolution clauses recur on every project you take, so fixing them once compounds across the whole book.
Bottom line: you’ve already paid for this work out of your own pocket. Florida protects people in that position, but only if they take the required steps on time. If a job has gone quiet on payment, the deadline question is the one to answer first — and it’s a short conversation.